Start Configuration
This function is used for the following operations:
- Register the Water and Sewer objects such as pipes, manholes, materials, valves, hydrants, connections, etc., that shall be used in the Water and Sewer Project.
- To define/edit the relation among the registered objects such as the following:
- Among various materials available (registered materials and built-in materials), which material is to be used for different pipe types such as water supply pipe, storm water pipe, sewage pipe, etc., relations are to be defined.
- Among various materials available, which material is to be used for different manholes such as, sewage manhole, storm water manhole, etc., relations are to be defined.
- To define/edit the various connections among the registered objects such as pipe-pipe connection, pipe-manhole connection, etc.
- To configure the drawing setup of various objects in plan view and profile view.
- To select the cross-section of the trench among various pre-defined and user-defined cross-sections. The selected cross-section will be the active cross-section.
- To configure the trench cross-section for position of pipes in the trench, protection layer, standard depth, gradient, rock shelf width, side slopes, distance sideways, etc.
- To define the trench foundation.
Run the function from the following locations:
The user interface 'Novapoint WS Config' of the function 'Start Configuration' will pop up.
The configuration dialogue contains the following drop down menus:
Menu: Water and Sewer > Start Configuration